<div dir="ltr">Late in the day India time would be best, I think. 1400 UTC perhaps?<br></div><div class="gmail_extra"><br><div class="gmail_quote">On Mon, Aug 29, 2016 at 5:45 PM, Michael Scherer <span dir="ltr">&lt;<a href="mailto:mscherer@redhat.com" target="_blank">mscherer@redhat.com</a>&gt;</span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">Hi,<br>
<br>
so since the release is on the 30, I was wondering if people would be ok<br>
with a small (less than 1h) downtime for upgrade and snapshot of the<br>
disk of gerrit and jenkins on the 1st of september.<br>
<br>
Any objections ?<br>
(and preferred time)<br>
<span class="HOEnZb"><font color="#888888">--<br>
Michael Scherer<br>
Sysadmin, Community Infrastructure and Platform, OSAS<br>
<br>
<br>
</font></span><br>______________________________<wbr>_________________<br>
Gluster-infra mailing list<br>
<a href="mailto:Gluster-infra@gluster.org">Gluster-infra@gluster.org</a><br>
<a href="http://www.gluster.org/mailman/listinfo/gluster-infra" rel="noreferrer" target="_blank">http://www.gluster.org/<wbr>mailman/listinfo/gluster-infra</a><br></blockquote></div><br><br clear="all"><br>-- <br><div class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr">nigelb<br></div></div>
</div>