<div dir="ltr"><div class="gmail_extra"><br><div class="gmail_quote">On Thu, Jul 21, 2016 at 7:56 AM, Michael Scherer <span dir="ltr">&lt;<a href="mailto:mscherer@redhat.com" target="_blank">mscherer@redhat.com</a>&gt;</span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">Hi,<br>
<br>
I plan to move the <a href="http://ci.gluster.org" rel="noreferrer" target="_blank">ci.gluster.org</a> server to the new location.<br>
<br>
This shouldn&#39;t result in any downtime, except on the Fedora 22 and 1<br>
centos 6 builder, which is not gonna disrupt much since I am not sure<br>
they are used. Therefor, I will assume I do not need to have a specific<br>
time for them (unless someone tell me the contrary)<br>
<br>
I will keep people posted, but I suspect his might be mostly a FYI.<br>
<br>
The next steps are then:<br>
<br>
- migrate/move jenkins and gerrit VM to a new server (will requires<br>
planning and downtime, since this will be disrupting, so I will discuss<br>
more later and make sure this is done at a time that cause the least<br>
possible trouble to production)<br>
<br>
- move the physical server formicary once the VM are moved (so like the<br>
first move, this shouldn&#39;t cause trouble once no service are running<br>
anymore on it)<br>
<span><font color="#888888"><br>
--<br>
Michael Scherer<br>
Sysadmin, Community Infrastructure and Platform, OSAS<br><br></font></span></blockquote><div><br></div><div>From the latest updates on the cage list, it looks like we&#39;re tracking for these moves/downtime for August 8-9? That&#39;ll be Monday-Tuesday. </div><div>Any complaints about that schedule?</div><div><br></div><div>- amye </div></div><div><br></div>-- <br><div data-smartmail="gmail_signature"><div dir="ltr">Amye Scavarda | <a href="mailto:amye@redhat.com" target="_blank">amye@redhat.com</a> | Gluster Community Lead</div></div>
</div></div>